Saturday, 17 June 2017

Rail electrification - noisy work ahead

Major electrification work will be taking place in our area from 19 August to 15 September, night and day. Some of the work will be noisy, and deliveries to Network Rail compounds along the route (e.g. Shire Way access point) will be made by road, so nearby roads will experience an increase in traffic.

The work will be on the main line from Royal Wootton Bassett, Wiltshire, to Patchway/Filton junctions, via Old Sodbury, Chipping Sodbury and Yate to Westerleigh Junction.

In addition, from 2 September to 15 September 2017, the work area will extend to include Westerleigh Junction towards Yate station, Coalpit Heath, Winterbourne, Stoke Gifford and Bristol Parkway station, up to Patchway/Filton junctions.

Network Rail say "We are electrifying the line to bring passengers quieter, more frequent and more reliable services between London Paddington and Cardiff"

The work includes:
  • Carrying out the piling required to install the foundations which will support the electrification equipment. That's the really noisy part.
  • Installing the equipment, including trackside masts and overhead wires at some locations.
  • Installing electrification equipment in Chipping Sodbury tunnel.
  • Improving flood resilience at Chipping Sodbury sidings.
  • Preparing Bristol Parkway station for the arrival of new InterCity Express trains, including the construction of a fourth platform.
How can you find out more?

1. Network Rail are setting up a dedicated web page at www.networkrail.co.uk/westernupgrade which will be available from Monday 19 June. It contains more detailed information about the work they will be carrying out and will be updated regularly as the project progresses. It also has a useful introductory video.

2. Network Rail will also be running drop-in sessions, when members of the project team will be on hand to explain the work and answer your questions. The sessions nearest to us are:
  • Thursday 29 June, Coalpit Heath Village Hall, 4.30pm to 7pm
  • Tuesday 4 July, Ridgewood Community Centre, Yate, 4.30pm to 7pm
  • Tuesday 11 July, The Old School Rooms, St Michael’s Centre, Stoke Gifford,
    4.30pm to 7pm
  • Wednesday 12 July, Chipping Sodbury Town Hall, 4.30pm to 7pm
  • Thursday 13 July, Trinity Primary School, Acton Turville, 6pm to 8pm
  • Tuesday 18 July, Old Sodbury Village Hall, 4.30pm to 7pm
  • Tuesday 25 July, All Saints Church Hall, Winterbourne Down, 4.30pm to 7pm.
3. If you have any questions about the work, you can email Network Rail at crwest@networkrail.co.uk or call the 24-hour National Helpline on 03457 11 41 41. For updates, you can follow them on Twitter @networkrailwest



No comments:

Post a Comment