Link Road, Yate to close for 5 weeks from Mon 11th October
Link Road will be closed for five weeks while preparatory works are carried out for the extension to Yate Shopping Centre.
However, shoppers will still have access to the Shopping Centre and the Total petrol station from the Kennedy Way direction on a temporary access road. Buses will also access the existing bus station along this temporary road. Traffic can then rejoin Link Road by taking a left turn out of the shopping centre car park.
Traffic wishing to use the overflow car park can access Link Road from the Station Road end and will have to leave by a right turn. All other traffic that normally uses Link Road will be diverted along Kennedy Way and Station Road.
The aim is to get the disruption out of the way before the busy Christmas opening in late November.
The contractors will be widening Link Road on the eastern (ooverflow) side; diverting the cycle and foot paths; infilling the Link Road underpass; and installing traffic management measures. The bus station remains unaffected although work will follow to build the new station ready for opening early in 2011.
This week's Gazette article includes local comments about the closure.
This week's Gazette article includes local comments about the closure.
No comments:
Post a Comment